• Document: BEKON Holding AG. Dry Fermentation Biogas + Composting Technology Company Technology Market Project Economics
  • Size: 2.78 MB
  • Uploaded: 2019-01-14 00:19:49
  • Status: Successfully converted


Some snippets from your converted document:

BEKON Holding AG Dry Fermentation Biogas + Composting Technology Company | Technology | Market | Project Economics BEKON Holding AG | Feringastrasse 9 | 85774 Unterföhring | Germany Phone: +49 (89) 90 77 959-38 | Fax: +49 (89) 90 77 959-29 | www.bekon.eu Management Board: Ralf Sigrist, Peter Klessascheck, Tobias Bauer District Court Munich - HRB 176964 | kontakt@bekon.eu Agenda 1 Overview 2 References 3 BEKON Technology 4 Case Study Steinfurt 5 Economics Presentation | BEKON Energy Technology | Waste-to-Energy + Compost | 18 March 2016 Slide 2 OVERVIEW Company History Technology and Track Record Established in 1992 as a consulting and engineering company. Since June 1999 BEKON has been concentrating on the development of concepts for biogas plants based on source separated biowaste and municipal solid waste (MSW) fines. The Munich Waste Services (AWM) plant is BEKON‘s first reference project (2003). The technology has undergone further developments and 26 patents have been granted. Since 2003 20 plants were built and successfully put into operation with more than 1,000,000 operating hours to date. Presentation | BEKON Energy Technology | Waste-to-Energy + Compost | 18 March 2016 Slide 3 REFERENCES Operating Projects in Germany, Switzerland, and Italy with more than 1,000,000 operating hours New Projects in Mexico, the United States, and China Track Record: Europe: > 1,000,000 operating hours Germany: 14 plants operating, 1 under construction > 2,500,000 t of waste treated Italy: 4 plants operating, 2 plants under construction, 3 planned 20 plants in operation Switzerland: 2 plants operating, 1 plant under construction 4 plants under construction 6 planned projects Asia: North America: China: 1 planned USA: 2 planned Mexico: 1 plant under construction Plants in operation or under construction Planning or approval phase Presentation | BEKON Energy Technology | Waste-to-Energy + Compost | 18 March 2016 Slide 4 AWR Rendsburg Eckernförde mbH Largest biogas plant for biowaste in Germany under construction BEKON plant, mesophilic (2008) Current expansion, thermophilic (Jan. 2016) Maximum capacity 80,000 t/a Presentation | BEKON Energy Technology | Waste-to-Energy + Compost | 18 March 2016 Slide 5 BEKON Technology Waste-to-Energy and Compost Revenues from Waste Gate Fees, Power, Gas and Heat 1 ton of waste BEKON Process Output per Revenue 1: CNG / Biomethane ton of waste Organic Fraction of Municipal 220 kWh Electricity + Solid Waste (OF MSW) 230 kWh Heat for Heating or Cooling or 1,000 km fuel equivalent Green Waste and 400 kg compost (quality depending on

Recently converted files (publicly available):