• Document: Installation instructions. Zip HydroTap. Filtered boiling and chilled drinking water for commercial kitchens and tea rooms.
  • Size: 5.4 MB
  • Uploaded: 2019-03-14 15:12:47
  • Status: Successfully converted


Some snippets from your converted document:

Installation instructions Zip HydroTap G4 ® Filtered boiling and chilled drinking water for commercial kitchens and tea rooms. VENTILATION IS ESSENTIAL Affix model number label ! READ here 801314UK SECTION 2 'VENTILATION' READ BEFORE YOU START 801314UK - G4 Boiling chilled commercial installation instructions - June 2016 - V2.04 Page 1 of 28 Tap options The G4 series offers a range of interchangeable taps to suit the customer's needs Classic HydroTap®G4 range These standalone taps are directly compatible with the G4 Command-CentreTM. Arc / Cube range Elite range The mixer tap range may be used in conjunction with any of the above to provide mixed hot and cold water for sanitary use. Mixer range The All-in-One tap may be used as alternatives to any of the above combinations. All-in-One range Page 2 of 28 801314UK - G4 Boiling chilled commercial installation instructions - June 2016 - V2.04 Index HydroTap®G4 specifications Installation check list..................................................................................................................... 4 General product features.............................................................................................................. 5 Important safety instructions......................................................................................................... 6 Warnings and regulatory information............................................................................................ 7 Major components and accessories.............................................................................................. 8 Technical specifications................................................................................................................ 9 Before installation and site requirements...................................................................................... 10 Installation instructions Step 1 - Measure and cut all the tap holes, fit the taps : Refer to 803341UK Tap installation instructions supplied with the tap head. Step 2 - Check for adequate ventilation. Section 1- Ventilation. 1.1- Ventilation for all models ............................................................................................11-12 Step 3 - Install the booster and / or filter / softener (if required). Section 2- Booster installation. 2.1- Booster specifications and descriptions...................................................................... 13 2.2- Installation procedure.................................................................................................. 14 2.3- Booster installation...................................................................................................... 14 2.4- Braided hose connections........................................................................................... 15 Section 3- Filter / softener installation. 3.1- Filter / softener installation.......................................................................................... 16 Step 4 - Install the Command-CentreTM. Section 4 - Command-CentreTM installation. 4.1- Check the external bypass valve setting .................................................................... 17 4.2- Fit the mains water supply hose................................................................................. 17 4.3- HydroTap®G4 models................................................................................................. 18 4.4- HydroTap®G4 and mixer tap combinations................................................................ 19 4.5- All-in-One 'Mains' tap.................................................................................................. 20 4.6- All-in-One 'Vented' tap................................................................................................ 21 Step 5 - Commission the HydroTap®G4. Section 5 - Commissioning. 5.1- Select language ......................

Recently converted files (publicly available):